07.11.26

The 5 Stages of a 60 Day Recruitment SEO Sprint

A 60 day recruitment SEO sprint runs in five stages, baseline, fix, build, prove and handover, and each one is signed off before the next begins. Kaizen SEO's K60 sprint costs £4,950 + VAT, rebuilds five money pages, ships one authority cluster and measures results at day 90 in your own Search Console.

Key Takeaways

  • Kaizen SEO's K60 sprint runs in five stages over 60 days, with written sign-off at the end of each stage.
  • The sprint targets five commercial keywords, chosen from day one research and approved in writing before work starts.
  • Deliverables include technical fixes, analytics and conversion tracking, five rebuilt money pages, one authority cluster and a validated FAQ and HowTo schema stack.
  • Results are measured at day 90, 30 days after the build ends, because new pages need time to rank.
  • If a target keyword misses page one or two at day 90, Kaizen SEO keeps working on it at no extra cost until it lands.

Why a Sprint Instead of a Retainer

A sprint gives a fixed scope, a fixed price and a defined outcome, where a retainer gives monthly activity with no end date. K60 costs £4,950 + VAT one-off, or two monthly payments of £2,850. There's no ongoing fee and no minimum term.

That structure answers the complaint agency owners raise most about SEO. They paid for months, got reports and couldn't tell what had changed. Our breakdown of why recruitment SEO retainers fail covers the retainer side, and our comparison of a retainer or a sprint sets out when each fits.

What is a recruitment SEO sprint?

A recruitment SEO sprint is a fixed length, fixed price programme with a defined outcome. Kaizen SEO's K60 runs for 60 days, targets five commercial keywords and measures them at day 90. The agency owns every asset built, whatever the outcome, and pays no ongoing fee.

The Five Stages

The five stages run in order, and each one is signed off in writing before the next begins. That keeps the agency in control of scope without turning the sprint into a weekly meeting schedule.

What happens in the baseline stage?

The baseline stage logs your money pages' positions, impressions and clicks in your own Search Console. You approve the five target keywords in writing before any work starts. That day one record is what every later result gets measured against, so nothing can be moved after the fact.

What gets fixed in the fix stage?

The fix stage clears technical faults blocking Google and AI engines from reading your site. It also wires up analytics and conversion tracking, so client enquiries from search are measured from then on. Kaizen SEO finds technical gaps like these usually clear inside 30 days.

What gets built in the build stage?

Five money pages are rebuilt around the target keywords, one authority cluster ships and up to 15 gated spoke pages are loaded. A validated FAQ and HowTo schema stack goes live on the pages. Everything is built and shipped inside the 60 days.

How are results proved at day 90?

Target pages are tracked against the day one baseline, and the result is evidenced at day 90 in your own Search Console. The 30 days after the build give new pages time to rank. If a keyword misses page one or two, work continues at no extra cost.

What do you get at handover?

You receive a 6 to 12 month roadmap and every asset built during the sprint. Nothing is held back if you stop after K60. Agencies then choose to stop, continue with K-Quarterly at £3,450 + VAT a quarter, or step up to K90 or K365.

What a K60 Sprint Includes

A K60 sprint includes the strategy, the fixes, the pages and the measurement, with components the K60 page values at £7,980 bought separately. The list is fixed before work starts, so scope can't drift halfway through.

  • Innovate Playbook strategy and technical audit
  • Technical fixes, plus analytics and conversion tracking
  • Five money pages rebuilt
  • One authority cluster and up to 15 gated spoke pages
  • A validated FAQ and HowTo schema stack
  • An AI visibility baseline covering ChatGPT, Gemini and Perplexity
  • A 6 to 12 month roadmap

Our line by line guide to what a recruitment SEO engagement includes shows how this compares with a typical retainer.

Does a K60 sprint include link building?

No. K60 excludes link building, which sits in K90 and K365. The sprint focuses on technical fixes, money pages and content the agency owns outright. K90 adds link building once K60 has proved the pages, which is the order the Kaizen Method runs in.

How to Prepare for a Recruitment SEO Sprint

  1. Step 1. Grant Search Console, GA4 and CMS access so the baseline can be logged on day one.
  2. Step 2. List the sectors and roles you want more client briefs for.
  3. Step 3. Review your Search Console queries for those sectors and shortlist the commercial searches.
  4. Step 4. Approve the five target keywords in writing.
  5. Step 5. Name one person to sign off each stage within two working days.
  6. Step 6. Book the day 90 results review before the sprint starts.

Search Console's Performance report is where the baseline and the day 90 result both live. Our guide to what ranking progress looks like shows how to read it.

Frequently Asked Questions

How much does a 60 day recruitment SEO sprint cost?

Kaizen SEO's K60 sprint costs £4,950 + VAT as a one-off fee, or two monthly payments of £2,850. There's no ongoing fee and no minimum term. The K60 page values the components included at £7,980 if they were bought separately.

What results can a 60 day SEO sprint deliver?

K60 guarantees five commercial keywords on page one or two of Google, measured in your own Search Console at day 90. The keywords are agreed in writing before work starts. If one misses, Kaizen SEO keeps working on it until it lands, at no extra cost.

Why are results measured at day 90 instead of day 60?

Results are measured at day 90 because new and rebuilt pages need time to rank after the build ends. The build finishes inside 60 days. The extra 30 days give Google time to recrawl and settle the pages before the benchmark is taken.

Do I own the work after the sprint?

You own every asset built during K60, including rebuilt pages, the authority cluster, schema and the roadmap. Ownership stays with you whatever the outcome. Nothing is locked behind a retainer, a platform login or an exit fee once the sprint is paid.

What happens after a K60 sprint?

After K60, agencies can stop, continue with K-Quarterly at £3,450 + VAT a quarter, or step up to K90 or K365. The day 90 numbers in your own Search Console guide that choice. The Kaizen Method runs K60 proves it, K90 arms it, K365 compounds it.

About the Author

Dan Jones is the founder and SEO lead at Kaizen SEO, a recruitment SEO and AI visibility consultancy based in Staffordshire. He worked as a recruiter before moving into search, and has spent more than 10 years running SEO for specialist agencies. Dan delivers every K60 sprint personally. Connect with Dan on LinkedIn.

January K60 slots are limited, because Dan delivers every sprint himself. Book your K60 sprint and have your day 90 results in April.